
Project Info
Category
Date
8 KW HYBRID SOLAR INSTALLATION – ABUJA
The objective was to provide a solar solution for the client, which would ensure they go off-grid and eliminate the use of their diesel generator.
The system includes 8 KW hybrid inverter paired with 12 units of 615W solar panels generating 7.4 kWp. A remote monitoring feature was integrated to track real-time performance and efficiency metrics of the installation
Our Main Goals
At Desamis, every project is tailored to meet the client’s specific energy requirements. This Bauchi installation demonstrates our expertise in deploying renewable energy systems that combine reliability, technology, and sustainability to empower businesses in challenging environments.
1
Sustainable Power for Production
To provide stable solar energy for continuous mill operations.
2
Cost Reduction & Efficiency
To minimize generator usage and reduce fuel costs.
3
Remote System Monitoring
To enable real-time tracking and performance optimization.
4
Supporting Local Industries
To help small and medium enterprises grow through clean energy access.